efuelsHynovera
Company Logo

Hy2Gen

Hynovera

The products are synthesized from biogenic CO2 combined with an electrolysis unit, powered by local renewable electricity guaranteed by a long-term PPA. Capacity is planned to be 130MW electrolysis and 123.000 tons/year CO2. Production would reach 32.000 t/year for e-SAF, and 700 t/year for e-Diesel. It consists of proposing a renewable and circular economy alternative to the planned closure of the Meyreuil/Gardanne coal-fired power plant. Gardanne coal mine closed in 2003, and a territorial act was signed in 2020 to open the soon-to-be unused land spaces to industrial activities of energy production, within the ecological transition framework. The location offers huge opportunities: within Aix-Marseille metropolitan and economic area, linked to road and railroad transportation means, near Marseille Provence International Airport. Hynovera is intended to answer local needs for renewable fuels. It will produce E-Kerosene from CO2 capture on an industrial scale compatible with the decarbonization challenges of the aviation sector, without its CO2 impact.

City

Gardanne

Country

France

Region

europe

Project name

Hynovera

Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
Hynovera
Project categories:
efuel
City:
Gardanne
County:
Gardanne
State:
Côte d'Azur
Country:
France
Region:
Europe
Primary product:
e-SAF
Secondary product:
e-Diesel
Yearly production volume (primary):
32,000 tons
Yearly production volume (secondary):
700 tons
Status:
Feasibility
Development:
Commercial
Commercial operation date:
2028-01-01
CO₂ utilized (mt/year):
123,000
Electrolyzer capacity (MW):
130
Reference:
https://www.hy2gen.com/hynovera
Utilization company:
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2022-08-16
France: Hy2gen and Technip Energies Cooperate on Feasibility Studies for Hynovera Project Aix-En-Provence