efuelsL Ardoise
Company logo

MGH Energy

L Ardoise

The L’Ardoise project will build and operate a first-of-a-kind integrated Power-to-Liquid facility producing 70 kt/year of e-kerosene for the aviation sector and 40 kt/year of e-methanol for the maritime sector, located in Laudun L' Ardoise, France. The core innovation of the project is a dual-output methanol-based architecture that couples a mature hybrid alkaline technology with a Solid Oxide Electrolysis (SOEC) unit, enabling flexible allocation between aviation and maritime fuels within a single industrial system.

Product
E-Kerosene
Volume
70,000 tons
Status
Feasibility
Year announced
—
Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
L Ardoise
Project categories:
efuel
City:
Laudun-L'Ardoise
County:
Roquemaure
State:
Gard
Country:
France
Region:
Europe
Primary product:
e-Kerosene
Secondary product:
e-Methanol
Yearly production volume (primary):
70,000 tons
Yearly production volume (secondary):
50,000 tons
Status:
Feasibility
Development:
Commercial
Commercial operation date:
2030-10-01
Reference:
https://mgh-energy.com/en/#projects
Utilization company:
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2026-02-10
MGH Energy installs a synthetic fuels plant on a former ArcelorMittal site in the Gard
2026-10-21
EU Awards €3.4B To 77 Net-Zero Projects, Including First DACCS Grant
Download

Project Documents

Technical, design, and planning materials outlining the project’s scope, development approach, and implementation details.