
Enchant Energy
Delta Gigasite Carbon Utilization Project
Enchant Energy entered into a letter of intent with Creekstone Energy to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah. The letter of intent advances a new model for carbon-smart infrastructure by capturing CO2 from the planned Phase 1 power generation facility and converting it into low-carbon fuels. The Delta Gigasite’s location in Millard County is central to the project’s feasibility. Access to abundant renewable energy, including solar, wind, and potentially geothermal, makes the rural Western U.S. uniquely suited to carbon utilization at scale. Unlike traditional carbon sequestration, which requires costly compression and pipeline infrastructure to move CO2 underground, Enchant’s utilization approach converts captured CO2 directly into liquid fuels, eliminating pipeline risk and generating revenue rather than cost. The liquid fuel production process also produces water as a byproduct, potentially reducing the data center’s overall water footprint.
Full Project Overview
All key information and technical data related to this project
Overview
Related News
Explore recent news and developments connected to this project.