
US Steel
Edgar Thomson CCS
GTI Energy will partner with U.S. Steel Corporation to advance the ROTA-CAP™ carbon dioxide (CO2) capture system to pilot scale (3 tonnes of CO2 captured/day). The project objectives are to design, build and operate an engineering-scale plant at U.S. Steel’s Edgar Thomson industrial iron and steel production facility in Braddock, Allegheny County, Pennsylvania. The project will be supported by Holcim US Inc., Enbridge Gas Inc., and Low Emission Technology Australia (LETA), with a goal to demonstrate that the capture system captures 95% of the CO2 from the industrial gas slipstream and produces a 95% pure CO2 stream. GTI Energy has completed more than 1,600 hours of testing with their skid-scale (1-tonne CO2/day) ROTA-CAP system at the National Carbon Capture Center (NCCC), with feed gas varying from 4% to 22% CO2, exhibiting up to 95% capture efficiency.
City
Braddock
Country
United States of America
Region
us
Gov funding
$7,000,000
Full Project Overview
All key information and technical data related to this project
Overview
Related News
Explore recent news and developments connected to this project.
Project Documents
Technical, design, and planning materials outlining the project’s scope, development approach, and implementation details.