captureTarim Low Carbon Ethylene Project
Company logo

CNPC

Tarim Low Carbon Ethylene Project

China National Petroleum Corporation put into operation the Tarim 1.2 MMtpy Phase II Ethylene Project and its supporting green and low-carbon demonstration facility in Korla. It directly uses renewable energy generated by Tarim Oilfield's photovoltaic facilities, with around 1 billion kilowatt-hours of green electricity supplied to the complex each year. It has also completed the construction of the world's second and China's first domestically developed electric-driven system for the three major ethylene compressors, shifting from thermal to electric power. In addition, it has adopted a first-of-its-kind integrated carbon capture technology in China to recover low-concentration carbon dioxide from cracking furnace flue gas that would otherwise be emitted into the atmosphere. The captured CO₂ and recovered byproduct hydrogen are reused in the production process, forming a closed-loop low-carbon industrial chain that connects green power, carbon capture, blue hydrogen, blue ammonia and lower-carbon fertilizer production.

CO₂ capture
Status
Operational
Sector
Chemicals
Year announced
Jul-2026
Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
Tarim Low Carbon Ethylene Project
Project categories:
capture
City:
Korla
County:
Korla City
State:
Xinjiang
Country:
China
Region:
Asia-Pacific
Sector:
Utilization company:
CO2 is utilized on-site
Status:
Operational
Date announced:
Jul-2026
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2026-07-21
CNPC launches China's first full-chain green, low-carbon ethylene project