enhanced-oil-recoveryCapturePoint Seminole East
Company logo

CapturePoint

CapturePoint Seminole East

CapturePoint LLC operates a carbon dioxide (CO2)-enhanced oil recovery (EOR) project in the Seminole East Field (SEF) located in Gaines County, Texas, approximately one and one-half miles northeast of the town of Seminole for the primary purpose of enhanced oil recovery using CO2 with a subsidiary purpose of geologic sequestration of CO2 in a subsurface geologic formation. The SEF is comprised of the East Seminole San Andres Unit (ESSAU) and the Lindoss Unit. Production is from the San Andres formation at an average depth of 5500 feet. The MRV plan was developed in accordance with 40 CFR §98.440-449 (Subpart RR) to provide for the monitoring, reporting and verification of the quantity of CO2 sequestered at the Seminole East Field during a specified period of injection.

Capacity
9,000,000 t
Injection rate
250,000 t/yr
Status
Permitted
Wells
0
Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
CapturePoint Seminole East
Project categories:
class_ii
County:
Gaines County
State:
Texas
Country:
United States of America
Region:
United States
Applicant name:
CapturePoint
Status:
Permitted
Reference:
https://www.epa.gov/ghgreporting/seminole-east-field-sef
Well applications:
18
Injection rate (Mt/year):
250,000
Injection years:
30
Total storage capacity (Mt):
9,000,000
Operations

Injection Volume

Reported CO₂ injection by year. The dashed amber line marks the project's permitted annual injection rate so over- or under-utilization is visible at a glance.

Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.