
CapturePoint
CapturePoint Seminole East
CapturePoint LLC operates a carbon dioxide (CO2)-enhanced oil recovery (EOR) project in the Seminole East Field (SEF) located in Gaines County, Texas, approximately one and one-half miles northeast of the town of Seminole for the primary purpose of enhanced oil recovery using CO2 with a subsidiary purpose of geologic sequestration of CO2 in a subsurface geologic formation. The SEF is comprised of the East Seminole San Andres Unit (ESSAU) and the Lindoss Unit. Production is from the San Andres formation at an average depth of 5500 feet. The MRV plan was developed in accordance with 40 CFR §98.440-449 (Subpart RR) to provide for the monitoring, reporting and verification of the quantity of CO2 sequestered at the Seminole East Field during a specified period of injection.
Full Project Overview
All key information and technical data related to this project
Overview
Injection Volume
Reported CO₂ injection by year. The dashed amber line marks the project's permitted annual injection rate so over- or under-utilization is visible at a glance.
Permitted Documents
Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.