classVIEastern Wyoming Sequestration Hub
Company Logo

Tallgrass Energy

Eastern Wyoming Sequestration Hub

The Tallgrass High Plains Carbon Storage Project, developed by Tallgrass High Plains Carbon Storage, LLC, is located in Laramie County, Wyoming, and is the anchor development within the Eastern Wyoming Sequestration (EWS) Hub. The project is permitted as a multi-well Class VI complex with a forecast storage capacity of approximately 130 million metric tons of CO₂ over a 30-year operating life. It is designed to serve industrial emitters across Wyoming, Nebraska, and Colorado, supported by extensive pipeline and storage infrastructure. The project includes six planned injection wells: Juniper I-1, Azalea I-1, Cypress I-1, Barberry I-1, Old Barberry I-1, and Spirea I-1; each paired with a corresponding monitoring well. All wells target the Lyons Sandstone at depths of about 9,100–9,200 feet, with robust regional seals including the Satanka, Chugwater, and Goose Egg formations ensuring long-term containment.

State

Wyoming

Country

United States of America

Region

us

Project name

Eastern Wyoming Sequestration Hub

Overview

Full Project Overview

All key information and technical data related to this project

Overview

Project name:
Eastern Wyoming Sequestration Hub
Project categories:
class_vi
County:
Laramie
State:
Wyoming
Country:
United States of America
Region:
United States
Applicant name:
Tallgrass Energy
Status:
Permitted
Well applications:
6
Injection rate (Mt/year):
9,000,000
Total storage capacity (Mt):
132,142,200
Leased acres:
193,595
Announcement date:
2023-12-21
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2022-01-20
Tallgrass to Develop a Commercial-Scale CO2 Sequestration Hub in Wyoming
2025-03-19
BLM seeks input on proposed southeast Wyoming carbon sequestration project
2022-02-09
Tallgrass Selects Project Canary for Monitoring, Assessment of Commercial-Scale CO2 Sequestration Hub in Wyoming
2024-05-11
Wyoming Issues Draft Injection Well Permit for Tallgrass CCS Project
2022-01-21
Tallgrass Energy wins grant for Wyoming CCS project
2022-05-18
Natural gas pipeline to be converted to transport carbon dioxide to Wyoming CCS hub
2025-02-13
POET and Tallgrass Announce Collaboration on Carbon Capture Project
2022-05-18
Tallgrass Energy, ADM plan CO2 transport and sequestration deal
2023-10-12
University of Wyoming Blue Hydrogen Project - Tallgrass
Data

Wells

Data for injection rates, perforation, and other well-related metrics.

Juniper I-1

Injection rate (Mt / year)
1,500,150
Injection years
5
Wellbore schematic
Perforation intervals (feet)
9,128 - 9,194
Well class
Injector

Azalea I-1

Injection rate (Mt / year)
1,500,150
Injection years
30
Wellbore schematic
Perforation intervals (feet)
9,349–9,410
Well class
Injector

Cypress I-1

Injection rate (Mt / year)
1,500,150
Injection years
19
Wellbore schematic
Perforation intervals (feet)
8,951–9,010
Well class
Injector

Barberry I-1

Injection rate (Mt / year)
1,500,150
Injection years
25
Wellbore schematic
Perforation intervals (feet)
8,951–9,010
Well class
Injector

Old Barberry I-1

Injection rate (Mt / year)
1,500,150
Injection years
1
Wellbore schematic
Perforation intervals (feet)
8,616-8,688
Well class
Injector

Spirea I-1

Injection rate (Mt / year)
1,496,865
Injection years
7
Wellbore schematic
Perforation intervals (feet)
9,447–9,511
Well class
Injector

Juniper M-1

Well class
Monitor

Azalea M-1

Well class
Monitor

Cypress M-1

Well class
Monitor

Barberry M-1

Well class
Monitor

Old Barberry M-1

Well class
Monitor

Spirea M-1

Wellbore schematic
Well class
Monitor

Fritz 1

API
49-021-05033
Well class
Stratigraphic
Permit date
2025-10-09
Data

Geology

Subsurface data for carbon storage.

Lyons

* Graph available
Gross thickness (ft)
67
Depth TVD (ft)
9,218
Porosity
18%
Permeability (md)
330
Temperature (°F)
251
Pressure (psia)
3,108
Salinity (ppm)
230,000
Krw @ Sgr
1
KrCO₂ @ Swr
0.5
Water exponent
2
CO₂ exponent
2
Residual water saturation
0.3
Model
Corey-Brooks
Relative Permeability Graph
Download

Project Documents

Technical, design, and planning materials outlining the project’s scope, development approach, and implementation details.

Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.