Estacado

The Estacado No. 1 well is an acid gas injection (AGI) carbon storage operation operated by Stakeholder Midstream as part of the Camp Viejo sequestration system. The well permanently injects treated acid gas streams produced during natural gas processing into deep geologic formations for long-term storage. Stakeholder anticipates increasing injection volumes up to approximately 19.7 MMscf/d at Estacado No. 1. The project has an anticipated injection duration of approximately 25 years beginning in 2019. The MRV plan establishes monitoring, reporting, and verification requirements under EPA Subpart RR to confirm permanent geologic sequestration.

Capacity
9,470,000 t
Injection rate
378,000 t/yr
Status
Permitted
Wells
0
Overview

Full Project Overview

All key information and technical data related to this project

Overview

Project name:
Estacado
Project categories:
class_ii
County:
Yoakum
State:
Texas
Country:
United States of America
Region:
United States
Applicant name:
Stakeholder Gas Services, Llc (811207)
Status:
Permitted
Well applications:
1
Injection rate (Mt/year):
378,000
Injection years:
25
Total storage capacity (Mt):
9,470,000
Leased acres:
200
Operations

Injection Volume

Reported CO₂ injection by year. The dashed amber line marks the project's permitted annual injection rate so over- or under-utilization is visible at a glance.

Data

Geology

Subsurface data for carbon storage.

Fasken

Gross thickness (ft)
1000
Depth TVD (ft)
12,052
Porosity
7.1%
Permeability (md)
45
Datum Depth (ft)
12,052
Pressure (psia)
5,091
Salinity (ppm)
100,000
Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.