The O’Neal Gas Unit Well No. 4 is an acid gas injection (AGI) carbon storage project operated by Ozona CCS, LLC, associated with StarTex’s Pawnee Treating Facility in Bee County, Texas. The project permanently injects treated acid gas (TAG) streams generated during natural gas processing into deep geologic formations for long-term storage. The facility has applied for a Class II AGI permit authorizing injection of up to approximately 1.5 million standard cubic feet per day (MMscf/d) of TAG. The injected stream is expected to consist primarily of ~98.2% CO₂, with minor hydrocarbons (~1.03%), hydrogen sulfide (~0.4%), and nitrogen (~0.37%). Injection is planned into the Sligo Formation at depths of approximately 15,874 to 16,056 feet. Ozona plans to conduct injection operations for approximately 12 years. The MRV plan submitted under EPA Subpart RR establishes monitoring, reporting, and verification requirements to quantify injected CO₂ volumes and demonstrate permanent geologic containment.

State

Texas

Country

United States of America

Region

us

Project name

O'Neal Gas Unit

Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
O'Neal Gas Unit
Project categories:
class_ii
County:
La Salle
State:
Texas
Country:
United States of America
Region:
United States
Applicant name:
Ozona CCS LLC
Status:
Permitted
Well applications:
1
Injection rate (Mt/year):
28,000
Injection years:
12
Total storage capacity (Mt):
34,600
Data

Geology

Subsurface data for carbon storage.

Upper Sligo

* Graph available
Gross thickness (ft)
183
Depth TVD (ft)
15874
Porosity
4.6%
Permeability (md)
.16
Salinity (ppm)
150,000
Krw @ Sgr
0.8
KrCO₂ @ Swr
0.5
Water exponent
1.8
CO₂ exponent
1.8
Residual water saturation
0.2
Model
Corey-Brooks
Relative Permeability Graph
Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.

Permitted files
ONeal_MRV.pdf