classVIPratt Energy CCS Project
Company logo

Pratt Energy

Pratt Energy CCS Project

Pratt Energy is developing a Class VI carbon sequestration project at its ethanol production facility, where the plant produces approximately 50 million gallons of ethanol per year and generates about 165,000 metric tons of CO₂ annually from fermentation processes. Under the Class VI permit, the project will involve the construction and operation of a single dedicated injection well to permanently store the captured CO₂ in deep geologic formations below the site of the ethanol plant.

Capacity
1,920,000 t
Injection rate
160,000 t/yr
Status
Permitted
Wells
5
Map layers
Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
Pratt Energy CCS Project
Project categories:
class_vi
City:
Pratt
County:
Pratt
State:
Kansas
Country:
United States of America
Region:
United States
EPA region:
7
Applicant name:
Pratt Energy
Status:
Permitted
Well applications:
1
Injection rate (Mt/year):
160,000
Injection years:
12
Total storage capacity (Mt):
1,920,000
Announcement date:
2023-12-01
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2024-02-22
Two Ethanol Firms Seek Permission For Carbon Sequestration Projects In Kansas
Data

Wells

Data for injection rates, perforation, and other well-related metrics.

Rolf 1

API
15-151-00477-00-01
Well class
Stratigraphic
Permit date
2026-03-27

Pratt Energy CCUS #1 (PECCUS-1)

Injection rate (Mt / year)
160,000
Injection years
12
Well class
Injector

Swingle 1

API
15-151-00051-00-01
Well class
Stratigraphic
Permit date
2026-03-27

PE AZM-1

API
15-151-22610
Well class
Monitor

PE IZM-1

Well class
Monitor
Data

Geology

Subsurface data for carbon storage.

Not available

Only injection formation is available.

Lansing-Kansas City Group (LKC)

Gross thickness (ft)
356
Depth TVD (ft)
3,745
Porosity
6.3%
Permeability (md)
9.2
Datum Depth (ft)
4,110
Temperature (°F)
103
Pressure (psia)
1,521
Salinity (ppm)
110,000

Shawnee

Gross thickness (ft)
175
Depth TVD (ft)
3,222
Porosity
8%
Permeability (md)
10
Temperature (°F)
97.3
Download

Project Documents

Technical, design, and planning materials outlining the project’s scope, development approach, and implementation details.

Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.