Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports — tab selection applies to every column.

Phillips 66 / Rodeo Refinery

Hydrogenpre-FEED· Phillips 66 Company· 2023-08-09Project page ↗Cost report ↗
CO₂ captured
190,000t/yr
Capture efficiency
95.0%
Utilization
94.5%
Parasitic load
MW
CO₂ concentration
18.0%vol%
Fixed OpEx$4.3M
Property taxes & insurance$1.3M
Maintenance material$1.9M
Operating labor$0.5M
Admin & support labor$0.5M
Variable OpEx$7.7M
Water$0.0M
Steam$3.1M
Electricity$4.5M
Total Opex$12.0M

Finnish Integrated Pulp and Board Mill / Capture of CO2 in both Kraft & Multi-boilers

Pulp and Paperpre-FEED· VTT Technical Research Centre of Finland· 2016-12-01Project page ↗Cost report ↗
CO₂ captured
1,749,600t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
28.5MW
CO₂ concentration
15.0%mol%
Fixed OpEx$19.1M
Property taxes & insurance$4.0M
Operating labor$2.0M
Maintenance labor$12.1M
Admin & support labor$1.0M
Variable OpEx$24.3M
Solvent & chemicals$3.8M
Natural gas fuel cost$12.9M
Electricity$7.0M
Waste disposal$0.6M
Total Opex$43.5M

Finnish Market Pulp Mill / Capture of CO2 in Kraft, Multi-fuel Boilers & Lime Kiln

Pulp and Paperpre-FEED· VTT Technical Research Centre of Finland· 2016-12-01Project page ↗Cost report ↗
CO₂ captured
1,946,575t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
31.4MW
CO₂ concentration
15.7%mol%
Fixed OpEx$16.2M
Property taxes & insurance$3.6M
Operating labor$1.3M
Maintenance labor$10.8M
Admin & support labor$0.5M
Variable OpEx$12.3M
Solvent & chemicals$4.2M
Electricity$7.4M
Waste disposal$0.7M
Total Opex$28.5M