Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

2 of 3 selectedClear selection46 reports
Comparing 2 reports — tab selection applies to every column.

Finnish Market Pulp Mill / Capture of CO2 in the Lime Kiln only

Pulp and Paperpre-FEED· VTT Technical Research Centre of Finland· 2016-12-01Project page ↗Cost report ↗
CO₂ captured
197,008t/yr
Capture efficiency
90.0%
Utilization
95.9%
Parasitic load
2.8MW
CO₂ concentration
27.6%mol%
Fixed OpEx$3.7M
Property taxes & insurance$0.6M
Operating labor$1.0M
Maintenance labor$1.7M
Admin & support labor$0.4M
Variable OpEx$1.2M
Solvent & chemicals$0.4M
Electricity$0.7M
Waste disposal$0.1M
Total Opex$4.9M

CLECO / Brame Energy Center Madison 3 Unit

CoalFEED· Cleco Power· 2025-03-25
CO₂ captured
4,280,000t/yr
Capture efficiency
95.0%
Utilization
80.0%
Parasitic load
MW
CO₂ concentration
14.1%vol%
Fixed OpEx$13.0M
Report did not provide a further cost breakdown.
Variable OpEx$107.9M
Report did not provide a further cost breakdown.
Total Opex$120.9M