Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports — tab selection applies to every column.

Scottish Power / Longannet Power Station

Natural GasFEED· ScottishPower· 2011-04-01Project page ↗
CO₂ captured
2,000,000t/yr
Capture efficiency
90.0%
Utilization
Parasitic load
MW
CO₂ concentration
Fixed OpEx$28.1M
Maint. / property taxes / insurance$11.2M
Operating labor$5.1M
Admin & support labor$11.9M
Variable OpEx$10.3M
Consumables$9.7M
Waste disposal$0.6M
Total Opex$38.4M

Technology Centre Mongstad

CoalLarge Pilot· Membrane Technology and Research (MTR)· 2023-08-15Project page ↗Cost report ↗
CO₂ captured
5,658,960t/yr
Capture efficiency
70.0%
Utilization
85.0%
Parasitic load
182MW
CO₂ concentration
12.5%mol%
Fixed OpEx$91.7M
Property taxes & insurance$45.1M
Maintenance material$20.6M
Operating labor$7.1M
Maintenance labor$13.7M
Admin & support labor$5.2M
Variable OpEx$149.9M
Water$3.1M
Solvent & chemicals$25.9M
Natural gas fuel cost$110.7M
Waste disposal$10.1M
Total Opex$241.6M

Southern Company / Plant Barry

Compression and Dehydration· Trimeric· 2020-02-01Project page ↗Cost report ↗
CO₂ captured
2,400,000t/yr
Capture efficiency
Utilization
95.0%
Parasitic load
MW
CO₂ concentration
99.0%vol%
Fixed OpEx$2.0M
Maintenance material$1.3M
Operating labor$0.7M
Variable OpEx$12.6M
Dehydration$0.6M
Electricity$12.0M
Total Opex$14.6M