Carbon Capture Costs: FEED & pre-FEED Cost Reports

Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports — tab selection applies to every column.

Scottish Power / Longannet Power Station

Natural GasFEED· ScottishPower· 2011-04-01Project page ↗
CO₂ captured
2,000,000t/yr
Capture efficiency
90.0%
Utilization
Parasitic load
MW
CO₂ concentration
Fixed OpEx$28.1M
Maint. / property taxes / insurance$11.2M
Operating labor$5.1M
Admin & support labor$11.9M
Variable OpEx$10.3M
Consumables$9.7M
Waste disposal$0.6M
Total Opex$38.4M

Calpine / Deer Park Energy Center

Natural GasFEED· Calpine· 2024-05-30Project page ↗Cost report ↗
CO₂ captured
6,200,000t/yr
Capture efficiency
95.0%
Utilization
90.0%
Parasitic load
184MW
CO₂ concentration
5.2%vol%
Fixed OpEx$26.2M
Report did not provide a further cost breakdown.
Variable OpEx$187.6M
Report did not provide a further cost breakdown.
Total Opex$213.7M

Southern Company / Plant Barry

Natural GasFEED· GE Gas Power· 2024-08-06Project page ↗Cost report ↗
CO₂ captured
1,632,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
18.4MW
CO₂ concentration
6.7%mol%
Fixed OpEx$32.1M
Property taxes & insurance$19.9M
Maintenance material$8.9M
Operating labor$0.5M
Maintenance labor$2.5M
Admin & support labor$0.2M
Variable OpEx$31.4M
Water$0.9M
Solvent & chemicals$11.5M
Natural gas fuel cost$18.8M
Waste disposal$0.1M
Total Opex$63.5M