Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports — tab selection applies to every column.

Milton R. Young Power Plant

CoalFEED· Minnkota Power Cooperative· 2023-02-20Project page ↗Cost report ↗
CO₂ captured
4,297,145t/yr
Capture efficiency
90.0%
Utilization
85.0%
Parasitic load
83.3MW
CO₂ concentration
8.6%vol%
Fixed OpEx
Report did not provide a further cost breakdown.
Variable OpEx
Report did not provide a further cost breakdown.
Total Opex

Holcim / Portland Cement Plant

Cementpre-FEED· Electricore· 2023-01-31Project page ↗Cost report ↗
CO₂ captured
1,733,750t/yr
Capture efficiency
90.0%
Utilization
Parasitic load
76MW
CO₂ concentration
10.1%vol%
Fixed OpEx
Report did not provide a further cost breakdown.
Variable OpEx
Report did not provide a further cost breakdown.
Total Opex$56.0M

Mustang Station Power Plant

Natural GasFEED· University of Texas at Austin· 2022-01-07Project page ↗Cost report ↗
CO₂ captured
853,644t/yr
Capture efficiency
90.0%
Utilization
52.0%
Parasitic load
46MW
CO₂ concentration
3.8%vol%
Fixed OpEx$32.6M
Property taxes & insurance$18.2M
Maintenance material$8.0M
Operating labor$3.3M
Maintenance labor$1.9M
Admin & support labor$1.2M
Variable OpEx$16.7M
Solvent & chemicals$3.4M
Natural gas fuel cost$9.5M
Electricity$3.8M
Total Opex$49.3M