classVISummit Carbon Storage
Company logo

Summit Carbon Solutions

Summit Carbon Storage

The Summit Carbon Solutions North Dakota Storage Complex is a large-scale Class VI CO₂ geologic sequestration project developed by Summit Carbon Solutions to permanently store carbon dioxide transported via the Midwest Carbon Express (MCE) pipeline from more than 50 ethanol plants across the Midwest. As originally permitted, the project consisted of three hub-scale storage facilities (Summit Carbon Storage #1, #2, and #3) located across Mercer, McLean, Morton, and Oliver Counties, North Dakota, collectively covering tens of thousands of acres of amalgamated pore space and permitted to store up to approximately 18 million metric tons of CO₂ per year, making it one of the largest Class VI storage developments in the United States. CO₂ is to be injected into the Broom Creek Formation. In August 2026, Summit formally requested cancellation of the Summit #1 and Summit #2 storage permits, effectively abandoning approximately two-thirds of the original North Dakota storage footprint after determining "as a matter of business judgment" not to proceed with construction, development, or operation of those two storage areas. The permit cancellations follow a lower district court decision earlier in 2026 that voided all three of Summit's state-issued storage permits, and were approved by the North Dakota Industrial Commission. Summit is now narrowing its state Supreme Court appeal exclusively to the remaining Summit #3 site, where it has secured approximately 98% of the necessary pore-space storage rights and faces less concentrated landowner litigation. The company has stated it will shift primary injection operations toward alternative storage hubs in Wyoming while maintaining its Midwest Carbon Express pipeline route easements and remaining North Dakota storage assets for potential future development.

Capacity
129,700,000 t
Injection rate
6,485,000 t/yr
Status
Permitted
Wells
9
Map layers
Overview

Full Project Overview

All key information and technical data related to this project

Overview

Project name:
Summit Carbon Storage
Project categories:
class_vi
City:
Beulah
County:
Oliver
State:
North Dakota
Country:
United States of America
Region:
United States
Applicant name:
Summit Carbon Solutions
Status:
Permitted
Well applications:
2
Injection rate (Mt/year):
6,485,000
Injection years:
20
Total storage capacity (Mt):
129,700,000
Leased acres:
146,500
Announcement date:
2021-02-18
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2025-01-13
North Dakota Landowners Challenge Carbon Storage Approval In Court
2024-12-23
Summit Carbon Solutions Secures Sequestration Permits from North Dakota Industrial Commission
2021-02-18
Green Plains Announces Carbon Sequestration Partnership with Summit Carbon Solutions
2021-12-01
Summit Carbon Solutions Announces Significant Carbon Storage Project Milestones
2021-04-20
Tiger Infrastructure Announces Agreement to Invest in Summit Carbon Solutions
2025-11-16
Pipeline opponents call for regulators to reject Summit’s proposed permit changes
2026-08-31
Summit Carbon Solutions Cancels Two North Dakota CO2 Storage Permits
Data

Wells

Data for injection rates, perforation, and other well-related metrics.

Milton Flemmer 1 (Withdrawn)

Wellbore schematic
Well class
Monitor

BK Fischer 1 (Withdrawn)

Injection rate (Mt / year)
3,064,905
Injection years
20
Wellbore schematic
Perforation intervals (feet)
5863-6096
Well class
Injector

Slash Lazy H 5

Wellbore schematic
Well class
Monitor

TB Leingang 2 (Withdrawn)

Injection rate (Mt / year)
3,075,125
Injection years
20
Wellbore schematic
Perforation intervals (feet)
5753-6043
Well class
Injector

KJ Hintz 1

Injection rate (Mt / year)
3,285,000
Injection years
20
Wellbore schematic
Perforation intervals (feet)
5382-5757
Well class
Injector

Archie Erickson 2 (Withdrawn)

Wellbore schematic
Well class
Monitor

TB Leingang 1 (Withdrawn)

Injection rate (Mt / year)
3,144,840
Injection years
20
Wellbore schematic
Perforation intervals (feet)
5756-6043
Well class
Injector

BK Fischer 2 (Withdrawn)

Injection rate (Mt / year)
1,850,000
Injection years
20
Wellbore schematic
Perforation intervals (feet)
5864-6096
Well class
Injector

KJ Hintz 2

Injection rate (Mt / year)
3,200,000
Injection years
20
Wellbore schematic
Perforation intervals (feet)
5382-5757
Well class
Injector
Data

Geology

Subsurface data for carbon storage.

Broom Creek

* Graph available
Gross thickness (ft)
272
Depth TVD (ft)
5,568
Porosity
17.1%
Permeability (md)
409-18.5
Datum Depth (ft)
5,630
Temperature (°F)
115.4
Pressure (psia)
2,713
Salinity (ppm)
105,000
Krw @ Sgr
1
KrCO₂ @ Swr
0.9
Water exponent
5.5
CO₂ exponent
5.5
Residual water saturation
0.05
Model
Corey-Brooks
Relative Permeability Graph
Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.