Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports — tab selection applies to every column.
Linde / Port Arthur Facility
CO₂ captured
1,435,000t/yr
Capture efficiency
92.0%
Utilization
90.0%
Parasitic load
—MW
CO₂ concentration
16.2%mol%
Facility scope
EngineeringKiewit (EPC costs for Svante’s equipment, steam generators, and OSBL construction), Linde (EPC costs for CO₂ purification/compression and EP costs for OSBL utilities)
Point source approachPost-Combustion Capture
CO₂ concentration16.2% mol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge—
Description
Linde Inc., with Linde Engineering Americas, Linde Engineering Dresden, and Svante Inc., is completing an initial engineering design for a commercial-scale CO₂ capture plant at its steam methane reforming hydrogen facility in Port Arthur, Texas. Using Svante’s VeloxoTherm™ solid adsorbent technology, the system will capture about 1 million tonnes of CO₂ annually at ≥90% efficiency while producing 99.97% pure “blue” hydrogen. The design will include ISBL units for flue gas conditioning and CO₂ purification, OSBL components, and a techno-economic analysis of capture costs and hydrogen production economics.
Linde Hydrogen Plant
CO₂ captured
1,360,000t/yr
Capture efficiency
95.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
18.3%mol%
Facility scope
EngineeringLinde Engineering
Point source approachPost-Combustion Capture
CO₂ concentration18.3% mol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge—
Description
Linde Inc., with Linde Engineering Americas and BASF, is conducting an initial engineering design for a 3,500 tonnes/day CO₂ capture plant using Linde-BASF’s advanced aqueous amine technology at a Linde-owned steam methane reforming facility. The project will define integration options, establish project requirements, optimize process design, and develop engineering, cost, and schedule packages. BASF will provide the technology design, LEA will deliver detailed engineering and constructability assessments, and Linde will lead techno-economic, environmental, and safety analyses in coordination with the SMR plant operators.
CRC / Elk Hills Power Plant
CO₂ captured
1,460,000t/yr
Capture efficiency
90.0%
Utilization
95.0%
Parasitic load
35MW
CO₂ concentration
4.3%mol%
Facility scope
EngineeringFluor
Point source approachPost-Combustion Capture
CO₂ concentration4.3% mol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages7
Compression inlet—
Compression discharge2,315 psia
Description
Electric Power Research Institute (EPRI), with Fluor Corporation and California Resources Corporation (CRC), conducted a FEED study to assess the feasibility of retrofitting Fluor’s solvent for post-combustion CO₂ capture at the 550 MW Elk Hills NGCC power plant. The system aims to capture approximately 4,000 tonnes of CO₂ per day (75% of total emissions, or 90% of an 83% slipstream), with the captured CO₂ intended for enhanced oil recovery. Deliverables include the full engineering design package—such as process flow diagrams, equipment datasheets, and capital cost estimates—optimized for site-specific performance, operations, and construction practices.