Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports — tab selection applies to every column.
Linde / Port Arthur Facility
CO₂ captured
1,435,000t/yr
Capture efficiency
92.0%
Utilization
90.0%
Parasitic load
—MW
CO₂ concentration
16.2%mol%
Facility scope
EngineeringKiewit (EPC costs for Svante’s equipment, steam generators, and OSBL construction), Linde (EPC costs for CO₂ purification/compression and EP costs for OSBL utilities)
Point source approachPost-Combustion Capture
CO₂ concentration16.2% mol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge—
Description
Linde Inc., with Linde Engineering Americas, Linde Engineering Dresden, and Svante Inc., is completing an initial engineering design for a commercial-scale CO₂ capture plant at its steam methane reforming hydrogen facility in Port Arthur, Texas. Using Svante’s VeloxoTherm™ solid adsorbent technology, the system will capture about 1 million tonnes of CO₂ annually at ≥90% efficiency while producing 99.97% pure “blue” hydrogen. The design will include ISBL units for flue gas conditioning and CO₂ purification, OSBL components, and a techno-economic analysis of capture costs and hydrogen production economics.
Prairie State Generating
CO₂ captured
7,676,700t/yr
Capture efficiency
95.0%
Utilization
90.0%
Parasitic load
—MW
CO₂ concentration
11.4%vol%
Facility scope
EngineeringKiewit, Sargent & Lundy
Point source approachPost-Combustion Capture
CO₂ concentration11.4% vol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge—
Description
Prairie State Generating Company is conducting a FEED study for a carbon capture facility on its 816 MWe Unit #2 in Illinois, using Mitsubishi Heavy Industries’ KM CDR Process™ with KS-21™ solvent. Designed to treat all flue gas from the unit, it would be the world’s largest post-combustion capture plant, compressing CO₂ for off-site sequestration. The project will leverage engineering support from Kiewit, Sargent & Lundy, and MHI.
Southern Company / Plant Barry
CO₂ captured
1,632,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
18.4MW
CO₂ concentration
6.7%mol%
Facility scope
EngineeringLinde Engineering (process engineering and equipment cost), Kiewit (plant layout, constructability, installation)
Point source approachPost-Combustion Capture
CO₂ concentration6.7% mol%
Flue gas pressure14 psia
Compressor nameplate20.8 MW
Compression stages—
Compression inlet—
Compression discharge2,215 psia
Description
General Electric Gas Power, with Linde, Kiewit, and Southern Company Services, is conducting a FEED study for a “Generation 2” amine-based post-combustion CO₂ capture system at an existing NGCC power plant. Targeting at least 95% capture efficiency, the design will emphasize optimized integration, lower CCS costs, and flexible operation to complement renewable energy. The 18-month project will progress from multiple conceptual designs to a single configuration, culminating in a detailed design, technical viability assessment, techno-economic and life cycle analyses, and a business case evaluation.