Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.

3 of 3 selectedClear selection46 reports
Comparing 3 reports — tab selection applies to every column.

Phillips 66 / Rodeo Refinery

Hydrogenpre-FEED· Phillips 66 Company· 2023-08-09Project page ↗Cost report ↗
CO₂ captured
190,000t/yr
Capture efficiency
95.0%
Utilization
94.5%
Parasitic load
MW
CO₂ concentration
18.0%vol%
Facility scope
EngineeringWorley
Point source approachPre-Combustion Capture
CO₂ concentration18.0% vol%
Flue gas pressure20 psia
Compressor nameplate
Compression stages5
Compression inlet25 psia
Compression discharge2,250 psia
Description
Phillips 66, with Worley Group Inc., is developing the initial design for a commercial-scale CCS system at the Rodeo Refinery hydrogen plant, targeting over 90% capture efficiency and storage of about 190,000 tonnes of CO₂ annually. The project will evaluate three capture configurations—flue gas plus PSA tail gas, syngas plus flue gas, and flue gas only—selecting the most cost-effective option through a techno-economic analysis. The chosen design will be advanced to a level suitable for the next engineering phase, concluding with a final TEA for the selected CCS configuration.

CEMEX / Balcones Cement Plant

Cementpre-FEED· Membrane Technology and Research (MTR)· 2022-06-03Project page ↗Cost report ↗
CO₂ captured
744,235t/yr
Capture efficiency
75.0%
Utilization
90.0%
Parasitic load
36MW
CO₂ concentration
14.9%vol%
Facility scope
EngineeringSargent & Lundy
Point source approachPost-Combustion Capture
CO₂ concentration14.9% vol%
Flue gas pressure14 psia
Compressor nameplate
Compression stages
Compression inlet
Compression discharge2,213 psia
Description
Membrane Technology & Research Inc., with Sargent & Lundy and CEMEX, is designing a full-scale Polaris membrane CO₂ capture system for the CEMEX Balcones cement plant in New Braunfels, Texas, targeting about 1 million tonnes of CO₂ capture annually. The study will develop the design basis, process design, cost estimates, permitting and safety reviews, constructability assessment, and a techno-economic analysis. Sargent & Lundy will lead the design work, while CEMEX will provide site-specific data for integration.

Technology Centre Mongstad

CoalLarge Pilot· Membrane Technology and Research (MTR)· 2023-08-15Project page ↗Cost report ↗
CO₂ captured
5,658,960t/yr
Capture efficiency
70.0%
Utilization
85.0%
Parasitic load
182MW
CO₂ concentration
12.5%mol%
Facility scope
EngineeringTrimeric
Point source approachPost-Combustion Capture
CO₂ concentration12.5% mol%
Flue gas pressure15 psia
Compressor nameplate
Compression stages6
Compression inlet6 psia
Compression discharge2,219 psia
Description
Membrane Technology and Research Inc., with Technology Centre Mongstad, Dresser-Rand, Trimeric Corporation, and WorleyParsons/Advisian, is scaling up its advanced Polaris™ membranes for post-combustion CO₂ capture and testing them at engineering scale at TCM in Norway. The Polaris membranes, about 20 times more permeable than prior commercial versions, use a patented selective recycle design to boost CO₂ concentration in flue gas and lower capture costs. The project will design, build, and operate a modular membrane system for a six-month field test, including performance verification, steady-state operation, techno-economic updates, and integration studies with advanced compression technology.