Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports — tab selection applies to every column.
Linde Hydrogen Plant
CO₂ captured
1,360,000t/yr
Capture efficiency
95.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
18.3%mol%
Facility scope
EngineeringLinde Engineering
Point source approachPost-Combustion Capture
CO₂ concentration18.3% mol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge—
Description
Linde Inc., with Linde Engineering Americas and BASF, is conducting an initial engineering design for a 3,500 tonnes/day CO₂ capture plant using Linde-BASF’s advanced aqueous amine technology at a Linde-owned steam methane reforming facility. The project will define integration options, establish project requirements, optimize process design, and develop engineering, cost, and schedule packages. BASF will provide the technology design, LEA will deliver detailed engineering and constructability assessments, and Linde will lead techno-economic, environmental, and safety analyses in coordination with the SMR plant operators.
Peterhead Power Station (Aberdeenshire)
CO₂ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
—
Facility scope
Engineering—
Point source approachPost-Combustion Capture
CO₂ concentration—
Flue gas pressure—
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge1,754 psia
Description
The Peterhead CCS Project in Aberdeenshire, Scotland, was designed to demonstrate the world’s first commercial-scale post-combustion CO₂ capture from a gas-fired power station. Using amine-based CANSOLV technology, it aimed to capture around one million tonnes of CO₂ annually from one turbine at SSE’s Peterhead Power Station, compress and condition it, and transport it via a new offshore pipeline for injection into the depleted Goldeneye gas reservoir over 2 km beneath the North Sea. The FEED study defined project scope, refined CAPEX and OPEX estimates, and assessed cost uncertainties, providing a basis for the Execute phase while also documenting budget performance and emergent costs during FEED.
Southern Company / Plant Daniel
CO₂ captured
1,769,520t/yr
Capture efficiency
90.0%
Utilization
—
Parasitic load
79MW
CO₂ concentration
—
Facility scope
EngineeringLinde Engineering (ISBL), Southern Company Services (OSBL)
Point source approachPost-Combustion Capture
CO₂ concentration—
Flue gas pressure15 psia
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge—
Description
Southern Company Services, with Linde Gas North America, is conducting a FEED study for a commercial-scale CO₂ capture system using Linde-BASF’s advanced aqueous amine technology at an NGCC plant of at least 375 MWe. The project will evaluate Alabama Power’s Plant Barry and Mississippi Power’s Plant Daniel to select the optimal host site, define project requirements, optimize process design, and deliver engineering packages along with a cost and schedule estimate within 15% accuracy. The study will build on prior feasibility work and site-specific testing.