Tools
Carbon Capture Costs: FEED & pre-FEED Cost Reports
Carbon capture costs from pre-FEED and FEED studies across power, cement, steel, natural gas, hydrogen and other industrial sectors. Browse capital (capex) and operating (opex) cost estimates from publicly available engineering reports, drill down into cost buckets and line items, and compare up to three projects side-by-side.
Comparing 3 reports — tab selection applies to every column.
CRC / Elk Hills Power Plant
CO₂ captured
1,460,000t/yr
Capture efficiency
90.0%
Utilization
95.0%
Parasitic load
35MW
CO₂ concentration
4.3%mol%
Facility scope
EngineeringFluor
Point source approachPost-Combustion Capture
CO₂ concentration4.3% mol%
Flue gas pressure15 psia
Compressor nameplate—
Compression stages7
Compression inlet—
Compression discharge2,315 psia
Description
Electric Power Research Institute (EPRI), with Fluor Corporation and California Resources Corporation (CRC), conducted a FEED study to assess the feasibility of retrofitting Fluor’s solvent for post-combustion CO₂ capture at the 550 MW Elk Hills NGCC power plant. The system aims to capture approximately 4,000 tonnes of CO₂ per day (75% of total emissions, or 90% of an 83% slipstream), with the captured CO₂ intended for enhanced oil recovery. Deliverables include the full engineering design package—such as process flow diagrams, equipment datasheets, and capital cost estimates—optimized for site-specific performance, operations, and construction practices.
Peterhead Power Station (Aberdeenshire)
CO₂ captured
1,000,000t/yr
Capture efficiency
90.0%
Utilization
—
Parasitic load
—MW
CO₂ concentration
—
Facility scope
Engineering—
Point source approachPost-Combustion Capture
CO₂ concentration—
Flue gas pressure—
Compressor nameplate—
Compression stages—
Compression inlet—
Compression discharge1,754 psia
Description
The Peterhead CCS Project in Aberdeenshire, Scotland, was designed to demonstrate the world’s first commercial-scale post-combustion CO₂ capture from a gas-fired power station. Using amine-based CANSOLV technology, it aimed to capture around one million tonnes of CO₂ annually from one turbine at SSE’s Peterhead Power Station, compress and condition it, and transport it via a new offshore pipeline for injection into the depleted Goldeneye gas reservoir over 2 km beneath the North Sea. The FEED study defined project scope, refined CAPEX and OPEX estimates, and assessed cost uncertainties, providing a basis for the Execute phase while also documenting budget performance and emergent costs during FEED.
Southern Company / Plant Barry
CO₂ captured
1,632,000t/yr
Capture efficiency
95.0%
Utilization
85.0%
Parasitic load
18.4MW
CO₂ concentration
6.7%mol%
Facility scope
EngineeringLinde Engineering (process engineering and equipment cost), Kiewit (plant layout, constructability, installation)
Point source approachPost-Combustion Capture
CO₂ concentration6.7% mol%
Flue gas pressure14 psia
Compressor nameplate20.8 MW
Compression stages—
Compression inlet—
Compression discharge2,215 psia
Description
General Electric Gas Power, with Linde, Kiewit, and Southern Company Services, is conducting a FEED study for a “Generation 2” amine-based post-combustion CO₂ capture system at an existing NGCC power plant. Targeting at least 95% capture efficiency, the design will emphasize optimized integration, lower CCS costs, and flexible operation to complement renewable energy. The 18-month project will progress from multiple conceptual designs to a single configuration, culminating in a detailed design, technical viability assessment, techno-economic and life cycle analyses, and a business case evaluation.