classVIDragon
Company Logo

Vault 44.01

Dragon

The Quest CCS Project, operated by Shell Canada in partnership with Chevron Canada and Canadian Natural Resources Limited, is located near Fort Saskatchewan, Alberta. Commissioned in 2015, Quest captures about 1 million tonnes of CO₂ per year from the Scotford Upgrader’s hydrogen production units, where CO₂ is separated during steam methane reforming. The captured CO₂ is compressed and transported through a 65-kilometer pipeline to an injection site north of Edmonton, where it is stored in the Basal Cambrian Sandstone, a deep saline aquifer more than 2 kilometers underground. Quest has safely stored over 7 million tonnes of CO₂ to date, with extensive monitoring and verification using seismic imaging, pressure monitoring, soil gas surveys, and groundwater sampling. The project was the first commercial-scale CCS facility for oil sands operations, and it continues to serve as a global reference for integrated CCS design and regulatory transparency. Performance data and lessons learned from Quest are publicly shared, contributing to the advancement of future large-scale CCS projects in Canada and worldwide. Vault has withdrawn this project to the EPA in late 2025.

City

Manito

Country

United States of America

Region

us

Project name

Dragon

Overview

Full Project Overview

All key information and technical data related to this project

Overview

Company:
Project name:
Dragon
Project categories:
class_vi
City:
Manito
County:
Tazewell
State:
Illinois
Country:
United States of America
Region:
United States
EPA region:
5
Applicant name:
Vault Dragon CCS LP
Status:
Withdrawn
Well applications:
1
Injection rate (Mt/year):
750,000
Total storage capacity (Mt):
9,000,000
Announcement date:
2024-11-25
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2024-11-06
Alto Ingredients, Inc. Enters CO2 Transportation and Sequestration Agreement with Vault 44.01
2024-03-11
Alto Ingredients, Inc. Enters Letter of Intent with Vault to Advance Carbon Capture and Storage Initiative
Data

Wells

Data for injection rates, perforation, and other well-related metrics.

Dragon Injection Well 1 (DRG INJ1)

Injection rate (Mt / year)
750,000
Injection years
12
Well class
Injector
Download

Project Documents

Technical, design, and planning materials outlining the project’s scope, development approach, and implementation details.