classVICTV Elk Hills 26R
Company Logo

California Resources Corp / Carbon TerraVault

CTV Elk Hills 26R

The Elk Hills 26R Storage Project, led by Carbon TerraVault (a subsidiary of California Resources Corporation), is located in the Elk Hills Oil Field of Kern County, California. The project proposes the development of four Class VI injection wells in the Monterey Formation’s 26R reservoir, situated about 6,000 feet below ground surface. It is designed to permanently store up to 1.46 million tonnes of CO₂ annually for 26 years, with injection planned to begin in 2025. The captured CO₂ will be sourced from the Elk Hills natural gas power plant, renewable diesel refineries, and other nearby industrial emitters . The storage formation is overlain by the Reef Ridge Shale, a thick, regionally continuous and low-permeability confining layer that has successfully trapped hydrocarbons for millions of years and contained more than 40 years of water and gas injection in the field. Extensive geologic and seismic characterization shows strong vertical and lateral confinement, minimal fault risk, and favorable porosity and permeability for injection. The project also benefits from decades of oilfield data, including over 7,500 wells and 3D seismic surveys, which provide a high degree of confidence in the site’s containment integrity. With its established infrastructure and proven reservoir performance, Elk Hills 26R is positioned as a cornerstone CO₂ storage hub within California’s San Joaquin Basin.

State

California

Country

United States of America

Region

us

Project name

CTV Elk Hills 26R

Overview

Full Project Overview

All key information and technical data related to this project

Overview

Project name:
CTV Elk Hills 26R
Project categories:
class_vi
County:
Kern
State:
California
Country:
United States of America
Region:
United States
EPA region:
9
Applicant name:
Carbon TerraVault I, LLC
Status:
Permitted
Well applications:
4
Injection rate (Mt/year):
1,460,000
Total storage capacity (Mt):
38,000,000
Announcement date:
2021-11-05
News

Related News

Explore recent news and developments connected to this project.

Date
Article title
Source
2025-01-06
CRC Approves California’s First Carbon Capture and Storage Project
2024-12-31
CRC’s Carbon TerraVault Receives EPA Permits for CO2 Injection and Storage in California
2023-08-01
Elk Hills Hydrogen Project with Lone Cypress
2023-05-01
Carbon TerraVault (CTV) entered into a storage-only Carbon Dioxide Management Agreement (CDMA) with InEnTec
2023-07-31
Signed storage-only CDMA with Verde for minimum volume commitment of 100 thousand metric tons per annum
2023-11-01
Entered into a storage-only carbon dioxide management agreement (CDMA) with NLC Energy (NLCE)
2025-10-17
California Breaks Ground On Its First Carbon Capture And Storage Project
Data

Wells

Data for injection rates, perforation, and other well-related metrics.

373-35R

Injection rate (Mt / year)
362,445
Injection years
27
Wellbore schematic
Perforation intervals (feet)
6807 - 7086
Well class
Injector

345C-36R

Injection rate (Mt / year)
362,445
Injection years
27
Wellbore schematic
Perforation intervals (feet)
6097 - 6101
Well class
Injector

353XC-35R

Injection rate (Mt / year)
362,445
Injection years
27
Wellbore schematic
Perforation intervals (feet)
6625 - 8373
Well class
Injector

363C-27R

Injection rate (Mt / year)
362,445
Injection years
27
Wellbore schematic
Perforation intervals (feet)
6698 - 8124
Well class
Injector

328-25R

Perforation intervals (feet)
5263
Well class
Monitor

376-37R

Perforation intervals (feet)
5830
Well class
Monitor

341-27R

Perforation intervals (feet)
6957
Well class
Monitor
Data

Geology

Subsurface data for carbon storage.

Monterey Formation 26R

Depth TVD (ft)
5,630
Porosity
22%
Permeability (md)
40
Datum Depth (ft)
5,360
Temperature (°F)
210
Pressure (psia)
150
Salinity (ppm)
25,000
Download

Permitted Documents

Official approval, consent, and compliance documents issued by authorities, confirming the project is authorised to proceed.

Permitted files
01-07-2025_363C-27R_Well_Permit.pdf
01-07-2025_373-35R_Well_Permit.pdf
01-07-2025_345-36R_Well_Permit.pdf
01-07-2025_353XC-35R_Well_Permit.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Area_of_Review__Corrective_Action_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Emergency__Remedial_Response_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Financial_Responsibility_Credit.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Financial_Responsibility.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Post-Injection_Site_Care_and_Site_Closure_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Preoperational_Testing_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Project_Narrative.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_345C_36R_Construction_Details.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_345C_36R_Plugging_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_345C_36R_Testing__Monitoring_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_345C_36R.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_353XC-35R_Construction_Details.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_353XC-35R_Plugging_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_353XC-35R_Testing__Monitoring_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_353XC-35R.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_363C-27R_Construction_Details.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_363C-27R_Plugging_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_363C-27R_Testing__Monitoring_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_363C-27R.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_373-36R_Construction_Details_373-35R.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_373-36R_Plugging_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_373-36R_Testing__Monitoring_Plan.pdf
03-26-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_373-36R.pdf
04-15-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_345C-36R_Permit.pdf
04-15-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_353XC-35R_Permit.pdf
04-15-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_363C-27R_Permit.pdf
04-15-2024_Carbon_TerraVaults_Elk_Hills_26R_-_Well_373-35R_Permit.pdf
08-09-2024_Carbon_TerraVaults_Elk_Hills_26R_-_EPA_EJScreen.pdf
Elk_Hills_Stratigraphy.png